Cadillac® Vortex CV-HS Meter

The meter of choice for high pressure saturated and super-heated steam.

Cadillac®  Vortex CV-HS Meter – Installation

Cadillac® Vortex CV-HS Meter installation instructions are outlined below.

To ensure proper operation, all Cadillac® Steam flow meters should be installed with proper flow conditioning. This requires certain minimum upstream and downstream straight piping runs.

In many steam systems the meter body size will be reduced for optimum meter performance and rangeability. This requires a reducing spool piece as illustrated.

With either reducer or expander piping ensure the upstream pipe length to be ten nominal pipe diameters or more, and downstream straight pipe to be five nominal pipe diameters or more.

Cadillac®  Vortex CV-HS Meter


Get in Touch

Central Station Steam Company
Cadillac® Meter
15615 SW 74th Avenue, Bldg. #150
Tigard, OR 97224

Contact us:
Toll-Free: (888)556-3913
Local: (503) 624-6331
Fax: (503)624-6131

Free product quote — No obligation

NAME *
EMAIL *

(*Required Fields)

Copyright © 2012, Cadillac Meter—Central Station Steam